Recherche PDF


Cet outil permet de trouver un fichier parmi les documents publics partagés par les utilisateurs de Fichier-PDF.fr.
Dernière mise à jour de la base de données: 23 avril à 19:33 - Environ 400000 fichiers indexés.

Afficher résultats par page

Réponses pour «availability»:



Total: 500 résultats - 0.026 secondes

100% - 2017 TARIF AXIS JUIN 2017

2017 TARIF AXIS JUIN 2017 Axis Communications Product Name Network C Minimum High volume order quantity order Status Product Number UK Product Number EUR Explosion Protected XF40-Q1765 ATEX IECEX 1 20 Description changed Built to order 0835-001 0835-001 XF40-Q1765 -60C ATEX IECEX 1 20 Built to order 0835-011 0835-011 XP40-Q1765 ATEX IECEX 1 20 Description changed Built to order 0836-001 0836-001 XP40-Q1765 -60C ATEX IECEX 1 20 Built to order 0836-011 0836-011 XF40-Q2901 ATEX IECEX 8.3FPS 19MM -40C 1 20 New Description changed Built to order 01089-001 01089-001 XF40-Q2901 ATEX IECEX 8.3FPS 19MM -60C 1 20 New Built to order 01090-001 01090-001 01098-001 01098-001 01099-001 01099-001 XP40-Q1942 ATEX IECEX 8.3FPS 19MM -40C 1 20 New Description changed Built to order XP40-Q1942 ATEX IECEX 8.3FPS 19MM -60C 1 20 New Built to order AXIS P8804 STEREO SENSOR KIT 1 20 01007-001 01007-001 AXIS P8535 SILVER IMPERIAL 1 200 0711-001 0711-001 Fixed Box AXIS P8535 BLACK IMPERIAL 1 200 0712-001 0712-001 AXIS P8535 SILVER METRIC 1 200 0713-001 0713-001 AXIS P8535 BLACK METRIC 1 200 0714-001 0714-001 AXIS M1004-W 1 200 EOL, contact Order dept for availability 0554-003 0554-002 AXIS M1004-W BULK 10PCS 1 20 EOL, contact Order dept for availability 0554-023 0554-022 AXIS M1013 1 200 EOL, contact Order dept for availability 0519-003 0519-002 AXIS M1013 BULK 10PCS 1 20 EOL, contact Order dept for availability 0519-023 0519-022 AXIS M1014 1 200 EOL, contact Order dept for availability 0520-003 0520-002 AXIS M1014 BULK 10PCS 1 20 EOL, contact Order dept for availability 0520-023 0520-022 AXIS M1014 SURVEILLANCE KIT 1 200 EOL, contact Order dept for availability 0520-043 0520-042 AXIS M1025 1 200 0555-003 0555-002 AXIS M1025 BULK 10PCS 1 20 0555-023 0555-022 AXIS M1034-W 1 200 EOL, contact Order dept for availability 0522-003 0522-002 AXIS M1034-W BULK 10PCS 1 20 EOL, contact Order dept for availability 0522-023 0522-022 AXIS M1054 1 200 EOL, contact Order dept for availability 0338-003 0338-002 AXIS M1054 BULK 10PCS 1 20 EOL, contact Order dept for availability 0338-021 0338-021 AXIS M1045-LW 1 800 0812-003 0812-002 AXIS M1065-L 1 2000 0811-001 0811-001

fichier-pdf.fr/2017/07/11/2017-tarif-axis-juin-2017/ 11/07/2017

99% - Rapport Ruptures SymphonyIRI

Rapport Ruptures SymphonyIRI White Paper Improving On-Shelf Availability It Matters More Andrew Mitchell – International Sales Director SymphonyIRI Group, Technology Services March 2011 02 About this white paper 02 What is On-Shelf Availability 03 Current situation 05 Why is this important?

fichier-pdf.fr/2011/05/03/rapport-ruptures-symphonyiri/ 03/05/2011

90% - Superior 2020

15x100mm, CENTER LOCK, Tubeless TIRES Schwalbe Racing Ralph SnakeSkin TL Easy, 29x2.25", ADDIX Speed/ Schwalbe Racing Ray SnakeSkin TL Easy, 29x2.25", ADDIX Speedgrip WEIGHT WEIGHT 9.6kg DRIVETRAIN CRANKSET Race Face NEXT SL, 34T CASSETTE SHIMANO XTR CS-M9100-12, 10-51T BOTTOM BRACKET Race Face BB92, PressFit, shell 41x92mm CHAIN SHIMANO XT CN-M8100 GEARS 1x12 SHIFTER SHIMANO DEORE XTR SL-M9100 Rapidfire Plus, 12-speed REAR DERAILLEUR SHIMANO XTR RD-M9100 Shadow Plus COMPONENTS BRAKES SHIMANO XTR BL-M9100/BR-M9100, hydraulic disc brake SADDLE fizik Antares R3 SEAT POST ONE1 Race Carbon Ultimate, 30.9x400mm HANDLEBAR ONE1 Carbon, Horizon Bow, 9° backsweep, 7mm rise, 760mm, 31.8mm STEM ONE1 Race RAS-D63028 Alloy, 31.8mm, -10° GRIPS ESI Racers Edge silicone grips *The specifications, colors, and availability of the products can be subjects to alter without prior notiication.

fichier-pdf.fr/2019/07/01/superior--2020/ 01/07/2019

90% - Superior 2021 wb en

Superior 2021 wb en Team XF 29 Issue R MTB FULL-SUSPENSION / TEAM MATTE CARBON/CHROME/TEAM RED GEOMETRY SPECIFICATION FRAME SIZE 15.5 17.5 19.0 21.0 FRAMESET CHAINSTAY LENGTH (MM) 430 430 430 430 FRAME EFFECTIVE TOP TUBE LENGTH (MM) 584 610 630 650 SEAT POST LENGTH (MM) 400 400 400 400 BB DROP (MM) 40 40 40 40 REACH (MM) 427 449 465 482 WHEELBASE (MM) 1124 1149 1169 1189 STACK HEIGHT (MM) 579 589 597 607 HEAD SET FORK WHEEL SIZE 29 29 29 29 HANDLEBAR WIDTH (MM) 760 760 760 760 HEAD TUBE LENGTH (MM) 90 100 110 120 SEAT TUBE LENGTH (MM) 393 431 482 533 SIZES STEM LENGTH (MM) 60 70 80 90 DRIVETRAIN HEAD TUBE ANGLE (DEGREE) 68 68 68 68 SEAT TUBE ANGLE (DEGREE) 74.9 74.7 74.6 74.5 CRANK LENGTH (MM) 170 175 175 175 GEARS SHIFTER REAR DERAILLEUR CRANKSET CASSETTE BOTTOM BRACKET CHAIN REAR SHOCK Carbon MTB Race Pro SU-01, Advanced Race Geometry, Travel 100 mm, Tapered Head Tube, BB92, 3D alloy one piece link, Carbon swingarm, SR dropout, Boost Thru Axle 12x148 mm, Inner cable routing, Dropped seat post ready ACROS AZX-220 R4, ZS44/28.6 | ZS56/40, BlockLock 150° DT Swiss F232 ONE O.D.L., Tapered, 15x110mm axle, remote Lockout, 110mm travel DT Swiss R 232 ONE, remote Lockout, size 190x45mm, Bushing body for DT Swiss MATTE CARBON/CHROME/TEAM RED 15.5, 17.5, 19.0, 21.0 1x12 SHIMANO XTR SL-M9100 Rapidfire Plus, 12-speed SHIMANO XTR RD-M9100 Shadow Plus Race Face NEXT SL, 34T SHIMANO CS-M9100-12, 10-51T Race Face BB92, PressFit, shell 41x92mm SHIMANO CN-M8100 COMPONENTS HANDLEBAR STEM GRIPS BRAKES SADDLE SEAT POST ONE1 Carbon, Horizon Bow, 9° backsweep, 7mm rise, 760mm, 31.8mm ONE1 Race Alloy, 31.8mm, -7° ONE1 VLG-1907D2, ONE1 VLG-1962-11D2, Lock-On SHIMANO XTR BL-M9100/BR-M9110, hydraulic disc brake fizik Antares R3 Crankbrothers Highline dropper post WHEELS TIRES WHEELSET * The specifications, colors, and availability of the products can be subjects to alter without prior notification.

fichier-pdf.fr/2020/07/14/superior-2021-wb-en/ 14/07/2020

89% - PCRED108022EN (web)

PCRED108022EN (web) Maximize protection Sepam series 10, 20, 40, 60, 80 Modular range of digital protection relays Fast Dependable Simple Increase energy availability 100% available energy Fast response 2 Maximum dependability Your electrical equipment is under control.

fichier-pdf.fr/2012/08/07/pcred108022en-web/ 07/08/2012

88% - nejmra Sickle Cell Disease

transfusions every 3–6 wk Prevention of additional silent ­cerebral infarctions 15–35 mg/kg/day 15–35 mg/kg/day Prevention of acute complications Primary stroke prevention Indefinite Indefinite Indefinite Indefinite Indefinite Indefinite Limited Lifelong (in ­malarious area) Lifelong At least until 5 yr of age Duration Strong Strong Moderate Moderate Moderate Strong Strong Strong Strong Strong Strong Recommendation Moderate High Moderate Moderate Low High Moderate Low Low Moderate Moderate Evidence Quality Limited availability Limited availability Limited availability Very limited ­availability Very limited ­availability Very limited ­availability Limited availability Limited availability Available Limited availability Available Availability in LowResource Areas * Data on recommended treatments, the strength of the recommendation, and the quality of the evidence are from DeBaun et al.,10 Ware et al.,11 and Yawn et al.12 Data on availability in low-resource areas are from Bello-Manga et al.13 HbS denotes sickle hemoglobin.

fichier-pdf.fr/2017/06/09/nejmra-sickle-cell-disease/ 09/06/2017

88% - VMware AirWatch Recommended Architecture Guide v9 1

High Availability 50 52 On-Premises Architecture High Availability Overview 53 High Availability Support for AirWatch Components 53 On-Premises Architecture Load Balancer Considerations 54 High Availability for AirWatch Database Servers 55 Chapter 9:

fichier-pdf.fr/2017/05/02/vmware-airwatch-recommended-architecture-guide-v9-1/ 02/05/2017

88% - HR1540

Availability of fiscal year 2011 funds for research and development relating to the B–2 bomber aircraft.

fichier-pdf.fr/2013/01/02/hr1540/ 02/01/2013

87% - powerpoint présentation hélicopter

powerpoint présentation hélicopter A 109 S GRAND – 2008 SN 22086| For Sale OVERVIEW Year Manufactured Total airframe Serial Number Configuration Engines Location Availability 2008 1160 Approx 22086 VIP Two Pratt &

fichier-pdf.fr/2014/10/15/powerpoint-presentation-helicopter/ 15/10/2014

85% - paperCFb

to fire new and challenging types of biomass in highly efficient largescale power plants while maintaining high plant availability.

fichier-pdf.fr/2019/10/05/papercfb/ 05/10/2019

82% - Cognitive biases in decision making

Process weight Process, analysis, andcarries industry variables explain decision-making effectiveness Process, analysis, and by industry variables Share of performance explained given element (based on multivariate regression analysis), % Process, analysis, and industry variables decision-making effectiveness explain explain decision-making effectiveness Share of performance explained by givenQuantity element and detail of analysis performed—eg, detailed financial (based regression analysis), % Share on of multivariate performance explained by given element modeling, sensitivity analysis, analysis of (based on multivariate regression analysis), % financial reaction of markets Quantity and detail of analysis performed—eg, detailed financial Quantity and detail of analysis 8 modeling, sensitivity analysis, analysis of performed—eg, detailed financial financial of markets modeling,reaction sensitivity analysis, analysisofofprocess to exploit Quality financial reaction of marketsanalysis and reach decision—eg, Industry/company variables—eg, 8 explicit exploration of major uncertainties, number of investment opportunities, 53 8 inclusion of perspectives that contradict 39 capital availability, predictability of Quality of process exploit senior leader’s point of to view, allowing consumer tastes, availability of resources analysisofand reach to decision—eg, Quality process exploit participation in discussion by skill and Industry/company variables—eg, to implement decision explicit exploration of major uncertainties, analysis and reach decision—eg, experience rather than by rank number of investment opportunities, 53 Industry/company variables—eg, inclusion of perspectives thatuncertainties, contradict explicit exploration of major 39 capital availability, predictability of number of investment opportunities, senior leader’s point of view, allowing 53 inclusion of perspectives that contradict 39 consumer tastes, availability of resources capital availability, predictability of participation in point discussion byallowing skill and senior leader’s of view, to implement decision consumer tastes, availability of resources experience than by rank participationrather in discussion by skill and to implement decision experience rather than by rank Note:

fichier-pdf.fr/2012/02/29/cognitive-biases-in-decision-making/ 29/02/2012

82% - 10.1007@s10916 011 9814 y

To this end, an integrated EMS cloud-based architecture has been developed that allows authorized users to access emergency case information in standardized document form, as proposed by the Integrating the Healthcare Enterprise (IHE) profile, uses the Organization for the Advancement of Structured Information Standards (OASIS) standard Emergency Data Exchange Language (EDXL) Hospital Availability Exchange (HAVE) for exchanging operational data with hospitals and incorporates an intelligent module that M.

fichier-pdf.fr/2016/01/18/10-1007-s10916-011-9814-y/ 18/01/2016

79% - Recruitments English version

A computer amateur to manage and make our website evolve, including the display of the alumni directory, of jobs and internships, and country profiles (we will soon implement a collaborative mode)… Availability :

fichier-pdf.fr/2015/10/19/recruitments-english-version/ 19/10/2015

78% - PACiS NRJED111002en

Based on the latest technologies, it offers powerful and fast automation to reduce outages, manage electrical network balance and optimize the energy availability in many electrical applications worldwide.

fichier-pdf.fr/2012/08/07/pacis-nrjed111002en/ 07/08/2012

78% - TheGlobalCompetitivenessReport2017–2018 copie

Institutions 1.01 Property rights 1.02 Intellectual property protection 1.03 Diversion of public funds 1.04 Public trust in politicians 1.05 Irregular payments and bribes 1.06 Judicial independence 1.07 Favoritism in decisions of government officials 1.08 Efficiency of government spending 1.09 Burden of government regulation 1.10 Efficiency of legal framework in settling disputes 1.11 Efficiency of legal framework in challenging regulations 1.12 Transparency of government policymaking 1.13 Business costs of terrorism 1.14 Business costs of crime and violence 1.15 Organized crime 1.16 Reliability of police services 1.17 Ethical behavior of firms 1.18 Strength of auditing and reporting standards 1.19 Efficacy of corporate boards 1.20 Protection of minority shareholders’ interests 1.21 Strength of investor protection 0-10 (best) Rank/137 Value Trend Index Component Rank/137 4 5.9 2 1 8 9 8 4 8 9 6 3 2 3 30 13 12 2 4 7 7 13 90 6.5 6.6 6.0 5.5 6.4 6.5 5.3 5.3 4.8 5.9 5.4 6.2 5.7 5.8 6.1 6.6 6.1 6.3 6.1 5.4 5.0 6 6.3 1 3 1 56 7 30 2 34 10 6.6 6.3 6.6 4.5 6.2 1,121.5 6.9 135.6 48.4 3 6.6 20 12 74 60 1 -0.1 34.4 -0.4 45.4 95.2 2 6.8 9.01 Availability of latest technologies n/a n/a 21 7 73 14 25 5 2 7 s.l.

fichier-pdf.fr/2017/10/16/theglobalcompetitivenessreport2017-2018-pdf-copie/ 16/10/2017

77% - BuellRetailCatalog en US

All items are also subject to availability and prior sale by authorized Harley-Davidson® and Buell® dealers.

fichier-pdf.fr/2015/12/15/buellretailcatalog-en-us/ 15/12/2015

77% - GIPS Evaluation, Recommendation & Approval Forms

The experience, qualifications and availability of research team …………………………………….

fichier-pdf.fr/2015/10/30/gips-evaluation-recommendation-approval-forms/ 30/10/2015

77% - W5 SyRS template

Its structure is consistent with hierarchical order to automatically find its parent input output external interfaces reliability availability maintainability accessibility environmental conditions ergonomic safety security facility transportability documentation training testing Priority 1 2 Originator Risk medium Name, signature and date for traceability low 3 necessary singular correct high Checker appropriate to level Name, signature and date for traceability Checklist to ensure the correct description of the requirement unambiguous complete conforming verifiable feasible Status proposed Comments Date reviewed accepted rejected Any additional relevant information, reference to external document, drawings Revision history Comments For traceability and lesson learnt Name SyRS Template XXX rev.YY Short title Unique ID number Description Performance Verification Rationale Type input output external interfaces reliability availability maintainability accessibility environmental conditions ergonomic safety security facility transportability documentation training testing Priority 1 Originator Risk high 2 medium 3 low necessary Checker appropriate to level singular complete correct conforming unambiguous verifiable feasible Status proposed reviewed accepted rejected Comments Date Revision history Comments Name

fichier-pdf.fr/2016/05/27/w5-syrs-template/ 27/05/2016

75% - SB 912 i 009 SB 912 071 SB 914 053

2) Material Information 2.1) Material- cost and availability Price and availability will be provided on request by ROTAX® Authorized Distributors or their independent Service Centers.

fichier-pdf.fr/2017/11/02/sb-912-i-009-sb-912-071-sb-914-053/ 02/11/2017

75% - CV version classique without pic.compressed

Maintained 24/7 availability for customer questions and concerns.

fichier-pdf.fr/2018/01/22/cv-version-classique-without-pic-compressed/ 22/01/2018

74% - Plan d action sécurité vues Gant et autres 2015 2016

02 February  2015 08:00 ‐ 10 November  2015 17:00 90 hrs Responsable formation Responsable RH Consultant Z Consultant Y Consultant X Centre de formation Z Centre de formation Y Centre de Formation X Président du CSST Responsable HSE 80 hrs Remaining Availability (Responsable HSE) 70 hrs 60 hrs 50 hrs Remaining Availability (Président du CSST) 40 hrs 30 hrs 20 hrs 10 hrs RESOURCE STATS Shows work stats for all your resources.

fichier-pdf.fr/2015/05/07/plan-d-action-securite-vues-gant-et-autres-2015-2016/ 07/05/2015

74% - Simon Swynghedauw CV EN

E-commerce in Russia (Quantitative study >1000 Russian respondents) o Secondary data collection, questionnaire design, methodology, analysis, results, recommendations  Product performance analysis on different Europeans markets  Semestrial activity sum up for every Europeans markets (Recruitment, Loyalty, Campaigns performance) Purchase Manager Assistant, Becquet, 1 year (September 2011 – August 2012)     Forecast and orders Orders management and follow up from “Great Import” suppliers (Pakistan, Bangladesh, India, China) Reporting to the product manager and purchasing Director Ensuring the availability of the references Commercial employee, Leclerc (été 2008, 2009, 2010, 2011)  Stocking the shelves, ensuring the availability of the references, deliveries reception Développement de web merchandising o Etude quantitative sur les habitudes des consommateurs Russes et Belges ligne ( de 1000 répondants) Education and en training Développement de sur les performances produit pour le R.U, le Portugal, l’Espagne, la Suisse et l’Allemagne “Grande École” program in sandwich courses:

fichier-pdf.fr/2014/10/20/simon-swynghedauw-cv-en/ 20/10/2014

74% - 2013 janvier Vérizon Sysadmin req System Engineering FreeIPA Intern

They must be configured in a high-availability setup so as to fit into our Disaster Recovery Plan.

fichier-pdf.fr/2013/01/09/2013-janvier-verizon-sysadmin-req-system-engineering-freeipa-int/ 09/01/2013